Mr. Gerke Faber - Curriculum Vitae
| QUALIFICATIONS: | B.E (Mechanical.) University of Tasmania Completed courses in:
|
| AFFILIATIONS: | I E Aust., Appita |
|
AREAS OF EXPERTISE: |
|
POSITIONS HELD:
| 1991 - Present | Covey Consulting | Engineering Manager |
| 1974 - 1990 | Associated Pulp and Paper Mills (now Australian Paper) |
August 1991 : Senior Pulp Mill Engineer - was appointed to this position but did not move into it due to DARS Commissioning March 1991 : Project Leader - Direct Alkali Recovery System (DARS) 1986 - 1991 : Senior Project Engineer (DARS) 1986 : Project Engineer - DARS Plant 1984 - 1986 : Area Engineer (Maintenance) - Pulp Mill North 1979 - 1984 : Area Engineer (Maintenance) - Pulp Mill South 1978 - 1979 : Asst. Project Engineer - Burnie Mill Expansion - Pulp Mill ClO2 Plant 1978 : Asst. Foreman - Cell Plant 1974 - 1977 : Asst. Project Engineer |
| 1973 | Completed degree in Mechanical Engineering. |
EXPERIENCE:
Covey Consulting
- Australian Paper - Shoalhaven
- Finishing operations review culminating in a $3m project installing equipment sourced from other AP mills.
- Project engineer for preliminary PM1 upgrade study and for the installation of spoiler bars.
- Australian Paper - Burnie
- Site engineer involved with installation of Drum Displacement Washer in Washing and Screening plant.
- Review of DARS Recovery process for improving uptime and throughput.
- Magnesium Oxide Metering Upgrade. $100,000 multi-disciplinary project to reduce over dosing.
- Australian Paper - Maryvale
- Engineering assistance during lime kiln ring gear repairs.
- Kimberly Clark Australia - Tantanoola Pulp Mill
- Design engineer for Pitch extraction project.
- Vent Gas Scrubber - $3M project. Completed design, prepared tender documents, site engineer during construction phase. Completed within budget.
- Commissioning process engineer on plant start up.
- Kimberly Clark Australia - Millicent Mill
- Project engineer for $4M upgrade of Tissue Machine No. 4.
- Associated Pulp and Paper Mills
- Preparation of operating manuals.
- Aluminates
- Project estimates.
Associated Pulp and Paper Mills - Burnie
- Direct Alkali Recovery System (DARS)
- $3.5M Project. Supervised engineers and draftsmen for the preparation of over 300 jobs for contract. Completed within budget and on time.
- Major project ($6.6M) to provide size control.
- Reviewed plant operations, including redesign of fluid bed furnace.
- Pulp Mill
- Area covered continuous digester, washing and screening plant, evaporators, lime kiln, rotary incinerators & waste heat boilers.
- Area covered ClO2 plant, mercury cell plant, bleaching plant, chip storage and screening.
- Pulp Mill ClO2 Plant
- Installation and commissioning.
- Cell Plant
- Production position.
- General areas
- The installation of a trial gas expander in the Wet Air Oxidation plant to recover energy from high pressure (21MPa) waste gases
PUBLICATIONS:
- "Writing better technical specifications"
Geoff Covey and Gerke Faber